The CESS distributed storage network report this week shows that the Pre-Mainnet Venus+ version has been stable for 150 days since its release, and the network ecosystem continues to expand. As of the reporting period, the system has registered over 930 storage nodes, with 5 consensus nodes maintaining the network, contributing a total storage capacity of 4.67 PiB. Among them, verified storage space has reached 382.27 TiB, indicating that CESS's network infrastructure in the decentralized storage field is gradually solidifying. As more nodes join and verification is completed, the available ca
View Original