Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Project Update on Minesto Dragons and Infrastructure in Vestmanna, Faroe Islands
This is a paid press release. Contact the press release distributor directly with any inquiries.
Project Update on Minesto Dragons and Infrastructure in Vestmanna, Faroe Islands
PR Newswire
Thu, February 26, 2026 at 1:26 AM GMT+9 2 min read
In this article:
7MN.F
0.00%
MINEST.ST
+3.34%
GOTHENBURG, Sweden, Feb. 25, 2026 /PRNewswire/ – Minesto’s Dragon testing in Vestmanna continues. The Dragon 12 powerplant has been installed (grid-connected) for 9 months since May 2025 and has provided valuable production and operational data. The Dragon 12 has proved robustness and stability beyond commercial service intervals. Dragon 12 is now operating in park-mode as a precaution given that preventive maintenance intervals have been exceeded. Minesto’s local marine contractor in the Faroe Islands is undertaking unforeseen service over winter on the vessel. Given the stable condition of the installed Dragon 12 and the significant costs associated with mobilization of an alternative vessel from abroad, the service recovery of Dragon 12 will be executed when the local vessel returns to operation.
A core competitive advantage with the Minesto technology relies on utilization of cost-effective local resources such as technicians, work vessels and harbours. The local marine service partner has been forced to conduct extensive unforeseen service over winter, limiting Minesto’s recovery options for preventive maintenance of the Dragon 12 powerplant. As precaution, the Dragon 12 is now operating in park-mode as service intervals have been exceeded.
_“Our cost-competitive, small-scale marine operations for installation and recovery makes it possible to utilise local work boats instead of large vessels. With satisfactory electricity production and testing during 2025 already at hand, the additional costs associated with bringing in foreign vessels for service recovery cannot be motivated,” _says Dr Martin Edlund, CEO of Minesto.
In parallel to the Dragon 12 testing, preparations for Dragon 4 activities have progressed. The Dragon 4 that was first launched three years ago has been serviced and upgraded for installation and production. The most significant improvement is a PTO (Power take-off system) upgrade which increases the power rating from 100kW to 185kW.
“To put it simply, the Dragon 4 has historically been more powerful than its ability to capture electric energy with its 100kW generator, so with this upgrade to 185kW, we get a more balanced system that can harvest up to twice as much energy at the given test site in Vestmanna. This is achieved without any noticeable impact on hardware costs,” says Dr Martin Edlund, CEO of Minesto.
Infrastructure upgrades
With the return of the local service vessel, the Dragon 4 production sites will be prepared for the more powerful Dragon 4 units. Work is also underway and will continue throughout the spring to accommodate the commercial microgrid set-up with a BES (battery energy storage system) - the world’s first tidal energy microgrid with integrated energy storage.
The preparations include upgrades and service of existing offshore infrastructure as well as additions to the onshore electric infrastructure, including installation of the BES.
The primary purpose of the Vestmanna test site in the short term will be to commission and demonstrate a microgrid powered by base-load tidal electricity. The ongoing 56 MSEK Microgrid demonstration project is jointly funded by Minesto, Capture Energy, IVL and the Swedish Energy Agency.
“We are preparing the Vestmanna site for demonstration of a complete commercial microgrid system that is offered in ongoing customer discussions at several identified locations around the world, including locally in the Faroe Islands,” says Martin Edlund.
**CONTACT: **
Contact
Cecilia Sernhage, Chief Communications Officer
+46 735 23 71 58
ir@minesto.com
This information was brought to you by Cision
The following files are available for download:
Cision
View original content:
Terms and Privacy Policy
Privacy Dashboard
More Info